$12.99
PART A -
• Part A consists of 4 problems, each weighted equally
1. (6.12 problem in text book – page 307) – Lottery Scheduling
2. (6.14 problem in text book – page 308)
3. (6.15 problem in text book – page 308) – Regressive Round Robin Scheduler
4. (6.23 problem in text book – page 310)
PART B –
• Part B consists of a Programming Project
1. Banker’s Algorithm (page 345 in the text book)